Skip to main content
Novel Technologies
AI, Data & Engineering

Cloud & Infrastructure

Cloud programmes go wrong in two predictable ways: lifting workloads unchanged and being surprised by the bill, or rebuilding everything at once and never finishing. We assess each workload on its merits, migrate in waves, and treat cost as an engineering constraint from the first design session.

Start a conversationFor enterprises
Platforms
AWS, Azure, GCP
Approach
Wave-based migration
Everything
Infrastructure as code
Cost modelling
Before and after, per workload
What's included

What this engagement covers

  • Migration assessment

    Workload-by-workload analysis producing a disposition for each — rehost, replatform, refactor, retain or retire — with cost modelling behind every call.

  • Cloud migration

    Wave-based execution with rollback plans, parallel running where risk demands it, and cutover runbooks rehearsed before the night they matter.

  • Platform engineering

    Internal platforms that give product teams paved paths — provisioning, deployment, secrets and observability available by default rather than by ticket.

  • Infrastructure as code

    Every environment reproducible from version control. No configuration that exists only in a console and only in one person’s memory.

  • Cost optimisation (FinOps)

    Rightsizing, commitment planning, storage tiering, and per-team cost attribution so spend becomes a number people can act on.

  • Reliability and observability

    SLOs tied to user-visible behaviour, structured logging, distributed tracing, and alerting that pages a human only when a human is needed.

Process

How migrations run

Written down so you can hold us to it.

  1. Discovery and dependency mapping

    Inventory every workload and map the dependencies between them — including the ones nobody documented. This is where most migration surprises are found or missed.

  2. Disposition and business case

    A disposition per workload with modelled cost, effort and risk. Some workloads should not move at all, and the analysis says so.

  3. Landing zone

    Accounts, networking, identity, guardrails and baseline observability built as code before the first workload moves.

  4. Wave migration

    Workloads move in waves grouped by dependency, starting with low-risk candidates to prove the runbook. Each wave has a tested rollback path.

  5. Optimise and operate

    Post-migration rightsizing, commitment purchasing and reliability tuning, then handover to your team with runbooks and paired on-call.

Outcomes

What good looks like

  • Every environment reproducible from version control
  • Cost attributed per team and per service, reviewed monthly
  • SLOs defined against user-visible behaviour, with error budgets
  • Deployment frequency up and change failure rate down, measured
  • Disaster recovery tested rather than documented
  • Your team operating the platform without us
Detail

Technologies

Cloud platforms

  • AWS
  • Microsoft Azure
  • Google Cloud
  • Hybrid and co-location
  • Multi-region design

Provisioning

  • Terraform
  • OpenTofu
  • Bicep
  • CloudFormation
  • Ansible
  • Crossplane

Runtime

  • Kubernetes
  • ECS & Fargate
  • Serverless
  • Service mesh
  • Container registries

Operations

  • Prometheus & Grafana
  • OpenTelemetry
  • Datadog
  • PagerDuty
  • Chaos testing
Questions

What people ask about this service

Including the ones with answers you might not want.

Will moving to cloud reduce our costs?
Not automatically, and anyone promising it will should be treated with suspicion. A lift-and-shift with no rightsizing usually costs more than the data centre it replaced. Savings come from rightsizing, commitment planning, retiring workloads and elasticity — all of which take deliberate engineering. Our assessments model both outcomes so you can see the difference.
Should we be multi-cloud?
Usually no. Multi-cloud roughly doubles platform complexity and rarely delivers the leverage people expect. Good reasons exist — regulatory requirements, acquisition history, a specific service only one provider offers — but "avoiding lock-in" on its own generally is not one.
Do we need Kubernetes?
Often not. Kubernetes is excellent when you have many services and a team to operate it. For a handful of services, managed container platforms or serverless deliver the same outcome at a fraction of the operational cost. We size the platform to your team, not to the industry conversation.
Can you work with our existing cloud team?
Yes, and it is the preferred arrangement. We frequently work as an embedded capability alongside an internal platform team, focusing on the areas where they lack depth or bandwidth rather than replacing them.

Still unresolved? Ask us directly.

Related
  • For enterprises

    Digital Transformation

    Modernising the processes and platforms a business runs on — sequenced so value arrives early and the organisation can absorb it.

    Service detail
  • For enterprises

    Enterprise Software Development

    Custom platforms and applications built to be maintained — tested, documented and handed over to your team.

    Service detail
  • For enterprises

    IT Consulting

    Technology strategy, architecture review and delivery assurance from senior practitioners who still build systems.

    Service detail
Next step

Get a migration assessment

A workload-level disposition and cost model, typically four to six weeks, delivered as a decision document.